|
Little Rock, Arkansas [2010 - in process] |
Tweet |
public
-
natural building solutions | little rock (8)
-
deer multi-purpose facility (23)
Deer, Arkansas
[2011 - in process]
The Deer Multipurpose facility is located in one of the most remote and beautiful places in all of Northwest Arkansas. This facility is designed for the students of the Deer School District. It gives them the opportunity to participate in a multitude of activities. The multi-purpose facility is equipped with a regulation 94' x 50' basketball court, locker rooms for both senior and junior high students, retractable bleachers for flexible staging of events, a music/band room, two classrooms, a main concession lobby, and restrooms. This new facility takes the local design language of the existing campus and melds it with new modern ideas.
Tweet -
post winery master planning + retail renovation (35)
Altus, Arkansas
[2009 - in process]
The Post Familie Winery carries on a rich tradition of wine making in the region. Modus was charged with designing a renovation to the retail store that includes new event spaces, developing a master plan for the campus, and redefining the processing and bottling details and layouts to expand and update the facilities. Sited on 17 acres of land in the heart of Altus, Arkansas, the winery has a strong local presence. With over 100 years of wine making experience, the facility has become a place of art and tradition. We intend to celebrate that experience and provide a forward thinking vision for the next generation.
Tweet -
carroll county airport (17)
Berryville, Arkansas
[February 2011]
The Carroll County Airport Terminal is an architectural machine inspiring the adventure of flight while simultaneously grounding itself as a proud artifact engaging the growing number of pilots and visitors to this rural Arkansas airport. Conceptually derived from the memory of a World War 2 airplane (F4U Corsair), the terminal building is a lens, capturing and projecting pilots to the landing area of the runway. The building seeks to take flight and shelters exterior spaces under its provocative wing-like forms.
Tweet -
eco modern flats | multi-family renovation (27)
Fayetteville, Arkansas
[2010 - in process]
ECO Modern Flats is a complete green renovation of an existing 96 unit apartment complex located in downtown Fayetteville, Arkansas. This project is the first LEED for Homes Multifamily project in the state of Arkansas to earn a LEED Platinum certification.
Visit ecomodernflats.com for more information.
Tweet -
Heber Springs Masterplan | Elementary School Addition (19)
Heber Springs, Arkansas
[2010 - in process]
This project is a new elementary school building on the Heber Springs school campus. The first phase of this project was to assist them in their campus growth plan and to help direct them in a master plan to realize the needs of the school and the potential of how to grow into their site. The first phase starts with the design of a new 12,000 s.f. elementary school addition.
Tweet -
green forest athletic complex (14)
Green Forest, Arkansas
[2010 - in process]
The next phase of our ongoing relationship with the Green Forest School District is to help master plan and provide a vision to the schools athletic program. The school district has recently refinanced some of their current debt and have elected to update the schools football stadium and track and field.
Tweet -
green forest middle school (17)
Green Forest, Arkansas
[August 2010]
2011 Arkansas AIA Merit Award Winner
The Green Forest Middle School is a modern, 2-story educational building located in the small agricultural community of Green Forest, Arkansas. The 29,014sf building acts as both a hub and backdrop for students and the inhabitants of the greater community by defining a landscaped plaza in the heart of the campus. Modern façade articulation of metal panel and concrete block re-imagines the use of durable, low-maintenance, and cost effective materials that are common to school construction. Powerful architectural elements define entry, inspire movement through the building, and contain key educational components in a fun, practical and sustainable way. The design is resolved through the use of economical and intelligent materials combined to enrich the existing campus through the interaction of people, space, form, and color—both internally and externally. This project earned a 2011 Arkansas AIA Merit Award for design.
Tweet -
esther's house orphanage (12)
Malawi, Africa
[June 2009]
Esther’s House Orphanage is a 11,439 sq. ft. facility located in Malawi, Africa. The site is located in the small village of Ntcheu, between the population centers of Blantyre and its capital city of Lilongwe. The centralized location in the country of Malawi and its position on the major connecting route between the two cities provides an excellent setting for future outreach to the rest of the nation.
Tweet -
the clinic at esther's house (9)
Malawi, Africa
[2009 - in process]
The next phase of esther's house project investigates a medical clinic is being designed to help aid and sustain the orphanage and provide developmental training for years to come. Esther’s house has sparked a more encompassing project that serves as a model for future orphanages in the Madzanje region.
Tweet



